ASHES HANDLING SYSTEM
|
|
: Comisión Federal de Electricidad
|
|
: México
|
|
: 01/05/1999
|
|
: The EPC contract includes the extraction, transportation and handling of all ashes from the Presidente Plutarco Elías Calles Thermoelectric Central to the ashes yard, with a capacity of 400 tons per hour.
The complete system has approx. 14 km of belt convey ors with a capacity up to 3,000 tons per hour and one stacker inside the ashes yard.
|
|
: Ashes handling and transportation system for the Presidente Plutarco Elías
Calles Thermoelectric Central.
|
|
|
|
|
|
|
|
| |